What is ready
Static public pages for the probability wall, OMEGA positioning, Black Vault funnel, access-depth model, methodology, sitemap and QA checklist.
This page separates what is ready as a static prototype from what must remain inactive or reviewed before any future release, provider, payment or data work.
Readiness page only. No deployment, checkout, Stripe mapping, Bizum activation, live data, provider connection or backend activation.
Static public pages for the probability wall, OMEGA positioning, Black Vault funnel, access-depth model, methodology, sitemap and QA checklist.
Probability scores, market strips, visitor counter, analytics readiness, PWA shell, confidence bands and all market examples.
Checkout, Stripe mapping, Bizum, live APIs, AI providers, alerts, account entitlements, payment gates and production analytics.
Commercial terms, access language, Black Vault distribution, provider disclosures, data-delay labels and future AI output controls.
Authentication, entitlements, provider routing, analytics collection, API endpoints, alert queues and storage flows.
ORBIT, NEXUS, OMEGA and THE BLACK VAULT REPORT commercial activation, Stripe products, invoices and payment provider flows.
Market data licensing, delay labels, source attribution, update cadence, redistribution permissions and outage behavior.
Desktop heroes, mobile nav, card grids, market strips, Black Vault pages, OMEGA panels, accessibility contrast and reduced motion.
Static build, generated-site validation, syntax checks and JS parse checks are part of the Phase 26 readiness gate.
Local Chromium screenshots covered index, Wall, Strips, Dashboard, Forecast, Probability Engine, Global Map, OMEGA, Black Vault and Access at desktop 1440x1200 and mobile 390x844.
Hero scale, dark command shell, mobile navigation density, ticker scrollbar visibility, card contrast and core page background consistency were corrected.
Real-device scrolling, keyboard focus, reduced motion, touch interaction and final art-direction review remain required before any commit or release work.
The installable mobile console, PWA readiness checklist, manifest metadata, offline fallback and service-worker public cache list were updated.
Real device scrolling, keyboard focus, reduced motion, PWA install/offline and accessibility contrast still require manual confirmation.
`site/`, `00_INBOX_DESCARGAS/`, secrets, backend/runtime areas, generated caches, unrelated dirty files and forbidden operational paths.
Phase 26 is a static prototype QA pass only. No staging, commit, push, deploy, checkout activation or provider connection is allowed.
The current surface can be reviewed as a static premium prototype. A future commit should remain scoped, exclude generated output and wait for manual browser/mobile QA results.